CMS develops detailed modular installation strategies and set plans that transform project drawings and logistics information into a clear, executable field plan.

 

A well-developed set plan gives project stakeholders a common roadmap for how the modular installation will occur.

CMS can assist with:

ChatGPT Image Aug 23, 2026, 02_34_21 PM.png
  • Module Set Sequencing — Establishing the order in which modules should be installed.

  • Set Plan Development — Creating visual plans identifying module numbers, locations, orientation, and installation sequence.

  • Building Installation Strategy — Determining the most practical progression through the building based on crane reach, access, structural conditions, and site limitations.

  • Site Preparation Requirements — Identifying conditions that should be completed before modular installation begins.

  • Delivery Coordination Requirements — Aligning transportation sequencing with the planned module setting order.

  • Crane & Set Integration — Coordinating the set sequence with crane positioning, pick radiuses, and anticipated crane movements.

  • Field Execution Planning — Identifying manpower, equipment, access, temporary protection, fall protection, and other installation considerations.

  • Contingency Planning — Evaluating potential disruptions and identifying alternative strategies when practical.

The CMS Advantage:

Our set plans are developed with one fundamental question in mind: Can the field team actually execute this plan safely, efficiently, and in the sequence shown?